Project Detail

Full upgrade of public stormwater drainage for a proposed new 2 lot subdivision.  Thrusted 225mm line with new manhole installed and private connection for new proposed dwelling.

Upgraded surface water catchment for driveway run-off.  Upgraded 150mm thrusted sewer main with 2 new private connections for existing and proposed dwellings.

Construction of new shared driveway with added thickness for compliance.

2